Skip to content

Septic, Title 5 and Adding Space on Cape Cod

On Cape Cod, your septic system is sized by bedrooms, not square feet. Title 5 counts 110 gallons a day for each bedroom. If an addition or ADU raises your bedroom count past what your septic permit allows, the system has to meet today's standards. In nitrogen-sensitive watersheds, that can mean a nitrogen-reducing (I/A) system.

Why do bedrooms, not square feet, decide what you can build?

  • Title 5 is the state septic code. It sizes a home's system by its "design flow," the wastewater it's built to handle: 110 gallons per day per bedroom, with a 330-gallon minimum for a single-family house.
  • Your system's approved capacity is the flow on its most recent septic construction permit at the Board of Health.
  • Adding bedrooms beyond that number counts as "new construction" under Title 5. The system then has to meet current standards.
More about why do bedrooms, not square feet, decide what you can build

About 85% of Cape Cod properties use septic systems (WBUR, Feb 2024), so on most Cape lots the septic permit, not the floor plan, sets how many bedrooms a house can have.

Here's how the math works. Title 5 gives a single-family home a design flow of 110 gallons per day for each bedroom, and never less than 330 gallons a day. A three-bedroom house is 330. A four-bedroom house is 440. (310 CMR 15.203)

What matters for your project is the approved design flow. Title 5 says that's "the flow listed in the most recent Disposal Works Construction Permit" for your system (310 CMR 15.204). That permit lives in your town's Board of Health file.

Go past it and two rules kick in:

  • Any increase in design flow above the existing approved capacity is "New Construction" under Title 5 (310 CMR 15.002).
  • The system must be upgraded first, and the upgrade has to fully meet new-construction standards, unless the Board of Health grants a variance (310 CMR 15.204).

Square footage on its own doesn't add design flow. A big family room, a bigger kitchen or a sunroom doesn't change the number, as long as it isn't a bedroom and doesn't push your total room count over the line (see the next section).

What counts as a bedroom under Title 5?

A room counts as a bedroom if it offers privacy, is meant mainly for sleeping, and has all of these:

  • at least 70 sq ft of floor space
  • a ceiling of at least 7 ft 3 in (new construction) or 7 ft 0 in (existing houses)
  • electrical service and ventilation
  • at least one window

Calling a room an "office" doesn't settle it. Title 5 also presumes bedrooms from your total room count.

More about what counts as a bedroom under Title 5

The state definition (310 CMR 15.002). A bedroom is "a room providing privacy, intended primarily for sleeping," with all of the features above. Living rooms, dining rooms, kitchens, halls, bathrooms, unfinished cellars and unheated storage areas over garages are not bedrooms.

The presumption rules. These catch most people off guard:

  • A single-family home is presumed to have at least three bedrooms, even if it has fewer.
  • If the house has more than eight rooms (not counting bathrooms, hallways, unfinished cellars and unheated storage), the presumed bedroom count is the total rooms divided by two, rounded down. A 10-room house is presumed to have 5 bedrooms, whatever the rooms are called.

So a "den" addition can change your bedroom count on paper, even with no closet and no bed.

The deed restriction option. Title 5 lets an owner design for fewer bedrooms than presumed by granting the Board of Health a deed restriction that limits the bedroom count (310 CMR 15.002). If your house already has one of these restrictions, adding a bedroom means asking the Board of Health to amend it (see the ADU section).

Your town may go further. Boards of Health can adopt their own rules on top of Title 5. Falmouth, for example, has a local supplement to Title 5 (FHR-15.0). Before you design a room that's meant to be "not a bedroom," check your town's definition with the Board of Health.

What triggers a septic upgrade when you add space?

What you're planningWhat Title 5 requires
Adding a bedroom beyond your permitted countThe system must meet new-construction standards before the work
Any expansion that needs a building permitA septic inspection first
An addition with no new bedrooms that changes the footprintFind every septic part, including the reserve area. Nothing can be built on them or within setbacks
Any permitted expansion, or added bedrooms, at a house on a cesspool or a failing systemUpgrade before the expansion

Source line under the table: 310 CMR 15.204 and 15.301(5), as of November 14, 2026.

More about what triggers a septic upgrade when you add space

All of this comes from 310 CMR 15.301(5) and 15.204:

  1. Inspection before you expand. "A system shall be inspected prior to any change in the type of establishment, or increase in design flow, or prior to any expansion of use of the facility" that needs a building or occupancy permit.
  2. Cesspools and failing systems get upgraded first. If the inspection finds a cesspool, or a system that fails Title 5's criteria, it has to be upgraded before the expansion.
  3. More bedrooms means new-construction standards. Before any increase in design flow above the approved capacity, the system "shall be upgraded in accordance with the standards applicable to new construction."
  4. Footprint-only additions. If an addition changes the footprint but adds no flow, the inspection becomes a check to locate all system components, including the reserve area. The new work can't sit on any component or inside Title 5's setback distances. If official records already show where everything is, that inspection isn't required.

Variances are hard to get for new construction. A Board of Health can vary Title 5, but for new construction the owner has to show that enforcing the rule would deprive them of "substantially all beneficial use of the property," and that equal environmental protection is possible another way (MassDEP ADU guidance, Apr 7, 2025). Don't plan a project around a variance.

What about a bathroom? A bathroom doesn't change your bedroom count, and bedrooms are what Title 5 sizes by. If the bathroom work needs a building permit and expands the house, though, rule 1 still applies: inspection first. See our bathrooms page.

Not sure what your septic allows? We'll check with you whether it can handle the project, and work with you and your Board of Health on the options. You don't need to hire your own septic designer or engineer.

What does Title 5 require for an ADU or in-law apartment?

  • An ADU is counted at 110 gallons per bedroom, just like the main house.
  • If the ADU adds bedrooms to the property, it's new construction, even if it gets its own septic system.
  • Sharing a system with the main house usually requires a two-compartment tank (or two tanks in series).
  • The minimum septic tank is 1,500 gallons, even for a one-bedroom ADU. Tight tanks aren't allowed.
More about what does Title 5 require for an ADU or in-law apartment

MassDEP published guidance in April 2025, and an FAQ revised September 11, 2025, on how Title 5 applies to ADUs. The key points:

  • Same flow, separate counts. ADUs use 110 gpd per bedroom. The main house and the ADU are counted separately. You don't add up all the rooms and divide by two.
  • One property, one system. If an ADU gets its own new septic system, MassDEP still treats both systems as "one septic system serving the Facility." Adding bedrooms anywhere on the lot raises the property's design flow.
  • When the ADU shares the main system and adds bedrooms, the existing system must meet new-construction standards for the total bedroom count, and you need a multi-compartment tank or two tanks in series. MassDEP notes a few exceptions: for example, an ADU with its own septic tank that feeds into the main tank's outlet line, or a Board of Health variance allowing an approved effluent tee filter instead. That variance is hard to get when bedrooms are added, because the stricter new-construction test applies (MassDEP ADU guidance and FAQ Q46).
  • When the ADU has its own system, that new system must meet new-construction standards for the ADU's bedrooms. Many properties have more than one system, and nothing prohibits it.
  • A new building is new construction. An ADU in a new building that needs an occupancy permit counts as new construction even if you take bedrooms out of the main house.
  • Swapping bedrooms in an existing building. If the Board of Health approves removing a bedroom from the main house to add one in an ADU inside an existing barn or outbuilding, MassDEP says it would not be subject to new-construction requirements. The system still has to be inspected and upgraded if it fails.
  • Older systems. Systems built under the 1978 Title 5 code are considered nonconforming. A cesspool has to be upgraded when an ADU is added, even with no new bedrooms, because the property now holds more than one dwelling unit.
  • Tricks that don't work. Removing a garbage disposal doesn't free up design flow. Tight tanks are prohibited for new construction.
  • Bedroom deed restrictions can be amended at the Board of Health's discretion. The board must release one if the property connects to sewer and the septic system is abandoned.

A note on pending changes. The state proposed revisions to its ADU regulations (760 CMR 71.00). Public comment closed October 9, 2026, and as of November 14, 2026 mass.gov still lists them as proposed. Until they are, plan on your town's current septic rules. For the zoning side, see our Cape Cod ADU rules guide and ADU vs. in-law addition.

Do I need a nitrogen-reducing (I/A) septic system on Cape Cod?

  • Maybe. Fourteen Cape towns have watersheds designated as Nitrogen Sensitive Areas, places where nitrogen from septic systems is polluting coastal bays. In them, new construction (including added bedrooms) has to use Best Available Nitrogen Reducing Technology (BANRT), usually an I/A (innovative/alternative) system that removes more nitrogen.
  • MassDEP set the start date at July 8, 2024, but suspends it in any watershed the town has covered with a watershed permit filing. MassDEP's June 11, 2026 table lists a filing or an existing watershed permit for all 14 towns. Check that your own watershed is on it.
  • Your town can still require it. Falmouth does, for added bedrooms in its nitrogen areas, starting Nov 15, 2025.
More about do I need a nitrogen-reducing (I/A) septic system on Cape Cod

Where it applies. In 2023, MassDEP designated 31 watersheds in 14 Cape towns as Natural Resource Nitrogen Sensitive Areas. Barnstable, Bourne, Brewster, Chatham, Dennis, Falmouth, Harwich, Mashpee, Orleans, Sandwich and Yarmouth were designated July 7, 2023. Eastham, Truro and Wellfleet followed on September 29, 2023. To check your lot, use MassDEP's Nitrogen Sensitive Areas Address Lookup map.

What "BANRT" means. Best Available Nitrogen Reducing Technology is an approved alternative system with total nitrogen in its effluent of 10 mg/L or less, or the lowest-nitrogen approved option if none reaches that (310 CMR 15.002). MassDEP keeps the approved list.

The timeline:

  • New construction: required from July 8, 2024 in all 31 watersheds, unless the town filed a Notice of Intent, a Watershed Permit application or a De Minimis Load application (MassDEP notice, Nov 30, 2023).
  • Existing systems: a five-year upgrade window, 7/8/2025 through 7/8/2030 for watersheds designated July 7, 2023, unless the town filed (MassDEP Q&A).
  • What a filing does: it suspends the requirement for both new construction and existing systems, but only in the watersheds it covers.

Where things stand. MassDEP's Watershed Application Table, dated June 11, 2026 (still the posted version on November 14, 2026), lists a filing for every one of the 14 towns. Each entry names the watersheds it covers, and some are existing watershed permits (Pleasant Bay) rather than new filings, so look for your watershed by name. Link: MassDEP Watershed Permit Application Table (opens in a new tab)

Why "suspended" isn't "gone":

  • If a town's watershed permit or exemption isn't issued, the requirement takes effect for systems in that watershed.
  • If a town misses the deadlines in its approved schedule, MassDEP can restart the requirements.
  • MassDEP's extension "does not alter or stay any requirement(s) specified by a town bylaw or regulation."

Falmouth's local rule. Falmouth's Board of Health adopted FHR 15.15, effective November 15, 2025. It requires BANRT (I/A or denitrifying systems) in Falmouth's nitrogen-sensitive areas for new construction, and lists "adding bedrooms to an existing home" as an example. Systems must reach total nitrogen of 10 mg/L or less. Properties in a future sewer service area are exempt if Town Meeting has approved sewer design funding. Falmouth's GIS map has a "Falmouth Nitrogen Regulated Areas" layer. More on our Falmouth page.

Other towns: check with your Board of Health whether a local rule requires I/A for added bedrooms.

Selling later. Before a sale, the seller must tell the buyer and the Board of Health whether the property is subject to a nitrogen upgrade requirement (310 CMR 15.215(4)).

Once you install one. An owner who installs BANRT under these rules doesn't have to move to a newer technology later, unless the system fails, a later change counts as new construction, or the system isn't protecting public health and the environment (310 CMR 15.215(2)(f)).

What does owning an I/A system involve?

  • An operation and maintenance contract with a qualified (often state-certified) operator, kept in place at all times
  • Inspection and sampling, most often four times a year at first, and sometimes reduced later if the system performs well
  • For I/A systems approved for pilot, provisional or remedial use, a notice recorded at the Registry of Deeds saying the property has an alternative system (your system's approval says whether yours needs one)
More about what does owning an I/A system involve
  • Contract. For alternative systems approved for remedial, pilot or provisional use, Title 5 requires the owner to "maintain an operation and maintenance contract with a Massachusetts certified operator where one is required" (310 CMR 15.287(9)). MassDEP's general-use approvals can carry the same kinds of conditions: O&M contracts, certified operators, and monitoring and reporting (310 CMR 15.288(3)). Barnstable County's septic site says owners must "have an Operation and Maintenance contract in place at all times," and each contract covers one year of maintenance and testing.
  • Sampling. The county site says Boards of Health most often require systems to be "inspected and sampled on a quarterly basis, or four times per year." The county says most towns allow reduced requirements for a system that consistently performs well, sometimes going from four times a year to once a year. Your system's MassDEP approval letter and your town set the actual schedule.
  • Records on title. For alternative systems approved for piloting, provisional or remedial use, the owner must record a MassDEP-approved notice of the system at the Registry of Deeds before the Certificate of Compliance is issued (310 CMR 15.287(10)), and must give a buyer written notice that it's an alternative system (310 CMR 15.287(5)). Systems certified for general use follow the conditions in their own MassDEP approval (310 CMR 15.288(3)). Ask your designer which applies to the system you're considering.
  • Ongoing cost. We haven't found a published, current Cape figure for annual O&M and sampling. Get the number from operators before you commit.

If you own a second home here, ask how sampling works around seasonal use. See our page for second-home owners.

What does a septic upgrade cost on Cape Cod?

Published figures (not Guild pricing):

  • Upgrading an existing system to an I/A system: roughly $30,000 (WBUR, Feb 2024)
  • Replacing a traditional system with a nitrogen-filtering one: $35,000 or more, about twice a traditional system (WBUR, Feb 2024)
  • Septic upgrades, listed as an added cost on ADU projects: $15,000–$45,000 (Cape & Coast Bank ADU loan page, "based on our lending experience," viewed Nov 2026)

Your site, soils, setbacks and bedroom count drive the real number. An engineer's design comes first.

More about what does a septic upgrade cost on Cape Cod

These are published third-party figures. We're showing them so you can plan, not as a quote. Costs swing with:

  • whether the existing system can be expanded or has to be replaced
  • soil test results and depth to groundwater
  • setbacks to wells, wetlands and property lines
  • whether an I/A system is required
  • whether the work is in a nitrogen-sensitive or water-supply area

For the full picture of addition, ADU and renovation costs on the Cape, see the Cape Cod renovation cost guide.

How can you pay for a septic upgrade?

  • Cape Cod AquiFund (Barnstable County): betterment loans for septic repairs, replacements, upgrades and I/A systems at 4% or 5%, with up to 20 years to repay. The 0% and 2% rates are only for new sewer connections.
  • State septic tax credit: 60% of up to $30,000 in costs, so up to $18,000, taken at up to $4,000 a year. It's for your principal residence and for required work. Check with a tax professional whether your project qualifies.
  • ADU loans: Cape & Coast Bank says septic upgrades can be rolled into its ADU financing.
More about how can you pay for a septic upgrade

AquiFund (capecod.gov).

  • Septic repairs, replacements, upgrades and I/A installations "are only eligible for 4% and 5% interest rate loans."
  • The 0% and 2% rates are only for new sewer connections. They require a single-family, owner-occupied, year-round primary residence. Rental and seasonal properties don't qualify for them.
  • A property listed, or expected to be listed, for sale within 12 months qualifies only for 5%.
  • Maximum term: 20 years. "Interest rates and eligibility criteria are subject to change without notice," so confirm with the county.

Septic tax credit (Mass. DOR, 2025 Schedule SC).

  • The credit is 60% of actual costs, counting up to $30,000, for a maximum of $4,000 a year and $18,000 in total per property. Unused credit carries forward up to five more tax years.
  • You must own the home, live in it as your principal residence, and not be someone else's dependent. Second homes don't qualify.
  • The core credit is for repairing or replacing a failed system. For tax years beginning on or after January 1, 2024, it also covers repairs, replacements, upgrades or sewer connections that are required by Title 5 or a MassDEP watershed permit (see DOR's TIR 24-14).
  • Costs for a system that hasn't failed and isn't required to be upgraded don't count.
  • DOR's TIR 24-14 says the expanded credit covers work such as nitrogen-reducing upgrades required under 310 CMR 15.215(2)(a) or (2)(d)1 or a MassDEP watershed permit, and sewer connections a watershed permit requires. You need a letter from your town saying the work was required. An upgrade you take on because you're adding bedrooms isn't one of DOR's listed examples, so don't count on the credit for it. Ask your tax preparer.
  • Keep your Certificate of Compliance or verification letter. DOR requires it.

ADU financing. Cape & Coast Bank's ADU loan page says "septic system upgrades—often necessary for ADU projects—can be included in your financing package." This is the bank's own statement. Ask your lender.

Is sewer coming to your street?

Several Cape towns are building sewers to meet their nitrogen goals. If sewer is planned for your street, it can change the whole plan: a short-term septic fix, an exemption from I/A, or simply waiting. Check your town's sewer map before you design.

More about is sewer coming to your street

What we confirmed (Nov 12, 2026):

  • Barnstable: a 30-year Comprehensive Wastewater Management Plan in "three, 10-year phases predominantly focused on sewer expansion." Phase 1 is roughly 90 miles of new sewer. The town's water resources site has a CWMP Sewer Expansion Map where you can search your address. → Barnstable page
  • Yarmouth: a new wastewater treatment facility and a collection system covering two-thirds of the town. Phase one includes sections of Route 28 and South Shore Drive, and the full project is projected to span 40 years (CAI, Sept 10, 2025). → Yarmouth page
  • Mashpee: WBUR reported in February 2024 that the town was spending $54 million on the first phase of its clean water plan, a new treatment plant and wastewater collection system. Check current connection areas with the town. → Mashpee page
  • Falmouth: under FHR 15.15, a property in a future sewer service area with Town Meeting-approved design funding doesn't need a nitrogen-reducing system. → Falmouth page
  • Bourne, Chatham, Harwich, Sandwich and other towns: confirm your street's status with the town's sewer or wastewater department. Local notes: Bourne septic and sewer rules · Chatham septic and sewer rules · Harwich septic and sewer rules · Sandwich septic and sewer rules

One more reason to check: if your home has a bedroom deed restriction, the Board of Health must release it when you connect to sewer and abandon the septic system (MassDEP ADU FAQ).

What records should you gather before you design?

Bring these to your first meeting with a designer or builder:

  1. Your most recent Title 5 inspection report
  2. The Board of Health file: the Disposal Works Construction Permit, Certificate of Compliance and as-built plan for your system
  3. Any bedroom deed restriction on your title
  4. Whether you're in a Nitrogen Sensitive Area (MassDEP lookup map), and your town's local rules
  5. If you have an I/A system: the O&M contract and recent sampling reports
  6. Your town's sewer plan for your street
More about what records should you gather before you design
  • Title 5 inspection. For a sale, an inspection is good for two years, or three if you have records showing the system was pumped every year (310 CMR 15.301(1)). For an expansion, the inspection has to happen before the work (310 CMR 15.301(5)). Older reports still show what's in the ground.
  • The permit sets your number. Your approved design flow is the flow on the most recent Disposal Works Construction Permit (310 CMR 15.204). Divide by 110 and you'll see how many bedrooms your system is approved for.
  • The as-built plan shows where the tank, distribution box, leach field and reserve area are. That decides where an addition can't go. If official records already show the components, a footprint-only addition may not need a locating inspection (310 CMR 15.301(5)).
  • Deed restrictions appear in the Registry of Deeds. They lock the bedroom count until the Board of Health amends or releases them.
  • Local rules. For property-specific Title 5 questions, the state says to contact your local Board of Health (mass.gov ADU page).

Have these and you'll know, before anyone draws a plan, whether your idea is a simple addition, a septic upgrade or a nitrogen-system project.

How Guild Design Build plans around septic

  • We check it with you first. Before design, we work with you to find out whether your septic can handle the ADU or addition.
  • We work it through with your Board of Health. Together with you and your town's Board of Health, we find out whether the project can go ahead and what your options are. Sometimes there's a way to avoid a full new septic system, but not always.
  • Our team covers the design and the site work. We handle design in-house, including architectural and structural design. Our team includes structural engineers, a professional land surveyor and septic design.
  • You don't need to hire your own designer, engineer, surveyor or septic designer. We handle the whole process.
More about how Guild Design Build plans around septic

On an addition, ADU or major renovation, we start with your records (above): the permit that sets your approved design flow, your bedroom count and your watershed. Then we work with you and the Board of Health on what the property allows. The options depend on your house and your town. One lawful route this guide already covers: a project that keeps the bedroom count within your system's approved design flow isn't "new construction" under Title 5 (310 CMR 15.002, 15.204), and a footprint-only addition with no new bedrooms needs a locating check rather than an upgrade (310 CMR 15.301(5)). Whether that works for your plans is something we check with you and your Board of Health. We can't promise a project will avoid a new system, and variances for new construction are hard to get (see above).

See an ADU we're building in Yarmouth Port: ADU build in Yarmouthport (opens in a new tab). Board-and-batten siding painted gray, white trim, a new roof and Harvey windows, with interior framing complete.

You don't need to hire your own designer, engineer, surveyor or septic designer. We handle the whole process.

Frequently asked questions

How many bedrooms can my septic system handle?

Take the design flow on your system's most recent Board of Health permit and divide by 110. A 440-gallon permit covers four bedrooms.

More about this answer: How many bedrooms can my septic system handle?

Title 5 sizes homes at 110 gallons per day per bedroom, with a 330-gallon minimum for a single-family house (310 CMR 15.203). Your "approved" flow is the one on the most recent Disposal Works Construction Permit (310 CMR 15.204). Going beyond it is new construction, and the system has to meet current standards.

How many bedrooms is a 1,500-gallon septic tank good for?

Tank size alone doesn't answer it. Title 5 sizes the whole system by design flow (110 gallons per bedroom), and 1,500 gallons is the minimum tank for a single-family home.

More about this answer: How many bedrooms is a 1,500-gallon septic tank good for?

Title 5 says a single-family home's tank can never hold less than 1,500 gallons (310 CMR 15.223(1)(a)). MassDEP confirms that "a 1,500-gallon septic tank is the minimum septic tank size," even for a one-bedroom ADU on its own system (MassDEP ADU FAQ, Sept 2025). Your bedroom capacity comes from the permitted design flow of the whole system, including the leach field, not the tank.

Can I add a bathroom without upgrading my septic?

Usually the bathroom itself doesn't change your septic sizing, because Title 5 sizes by bedrooms. But if the work needs a building permit and expands the house, Title 5 requires a septic inspection first.

More about this answer: Can I add a bathroom without upgrading my septic?

If that inspection finds a cesspool or a failing system, it has to be upgraded before the expansion (310 CMR 15.301(5)). If the addition changes the footprint, it can't sit on any septic component or inside setback distances.

If I call the new room an office, does it still count as a bedroom?

It can. Title 5 looks at the room's features (privacy, 70+ sq ft, ceiling height, electrical service and ventilation, a window) and at your total room count, not the name on the plan.

More about this answer: If I call the new room an office, does it still count as a bedroom?

A house with more than eight rooms is presumed to have half that many bedrooms, rounded down (310 CMR 15.002). Your town's Board of Health may have its own definition, so confirm before you design.

Do I need an I/A septic system to add a bedroom on Cape Cod?

Not always. It depends on your watershed, whether your town's watershed permit filing with MassDEP covers it, and your town's own rules.

More about this answer: Do I need an I/A septic system to add a bedroom on Cape Cod?

The state requirement for new construction in Cape nitrogen-sensitive areas (from July 8, 2024) is suspended in watersheds a town's filing covers, and MassDEP's June 11, 2026 table lists filings in all 14 towns. Check that your watershed is named. A town can still require I/A locally. Falmouth does for added bedrooms in its nitrogen areas, starting November 15, 2025.

Can an ADU have its own septic system?

Yes. Many properties have more than one system. The ADU's system must meet new-construction standards for its bedrooms.

More about this answer: Can an ADU have its own septic system?

MassDEP treats all systems on a lot as one system serving the property. If the ADU adds bedrooms and the main house's system is nonconforming (a cesspool, a failed system or a pre-1995 system), the main system must also meet new-construction standards for the main house's bedrooms (MassDEP ADU guidance, Apr 2025).

Does the Massachusetts septic tax credit cover my upgrade?

Possibly, if it's your principal residence and the work is required: a failed system, or an upgrade required by Title 5 or a watershed permit. The credit is 60% of up to $30,000, a maximum of $18,000 total and $4,000 a year.

More about this answer: Does the Massachusetts septic tax credit cover my upgrade?

Second homes don't qualify. Costs for a system that hasn't failed and isn't required to be upgraded don't count. An upgrade done to add bedrooms isn't one of DOR's listed examples, so ask your tax preparer before counting on it (Mass. DOR, 2025 Schedule SC; TIR 24-14).

How long is a Title 5 inspection good for?

For a home sale, two years, or three with records showing the system was pumped every year.

More about this answer: How long is a Title 5 inspection good for?

That's the rule for transfers of title (310 CMR 15.301(1)). For an addition, Title 5 requires an inspection before the expansion (310 CMR 15.301(5)). Ask your Board of Health whether an existing report will satisfy them.