ADU rules on Cape Cod: what the state allows and what your town still controls
As of November 2026, Massachusetts lets you build one ADU by right in a single-family zone. It can be up to 900 sq ft or half your home's floor area, whichever is smaller. Your Cape town can't require owner occupancy or a special permit. It can still enforce Title 5 septic limits, setbacks, height limits and short-term rental limits.
What are the new ADU rules in Massachusetts?
- One ADU per lot is protected by right in any single-family zoning district. "By right" means the town must allow it if it meets the basic rules: no special permit, variance or other case-by-case approval for that one unit or for renting it.
- Size: no bigger than half the main house's gross floor area or 900 sq ft, whichever is smaller. Gross floor area (GFA) is the total finished floor space with full ceiling height. A town may allow bigger, but it can't force a smaller one unreasonably.
- It needs its own sleeping, cooking and bathroom space, plus a separate entrance (directly outside, or through a shared hall that meets the building code for safe exit).
- It can be inside the house (a basement or attic conversion), attached as an addition, or a detached cottage or garage apartment.
More about what are the new ADU rules in Massachusetts
- The law. The Affordable Homes Act (Chapter 150 of the Acts of 2024), signed August 6, 2024, amended the Zoning Act, M.G.L. c.40A. Section 1A defines an ADU. Section 3 holds the protection: "No zoning ordinance or by-law shall prohibit, unreasonably restrict or require a special permit…" for a single ADU in a single-family district. The protection took effect Sunday, February 2, 2025.
- The state regulation. The Executive Office of Housing and Livable Communities (HLC) wrote the details in 760 CMR 71.00, "Protected Use Accessory Dwelling Units." It took effect January 31, 2025. It is the rulebook your building department works from.
- What counts as floor area. Under 760 CMR 71.02, gross floor area counts every floor with code-compliant ceiling height, including basements and lofts. It excludes crawl spaces, garage parking areas, attics and enclosed porches. If you have more than one main house on the lot, the largest one sets the ADU's size cap.
- "Single-family zoning district" is broad. It includes any district where a single-family home is allowed, by right or by special permit. On the Cape that covers most residential neighborhoods.
- Only one ADU per lot is protected. If your town allows a second ADU, state law says it needs a special permit.
- Nonconforming lots and houses still qualify. An older Cape on an undersized lot, or a house that's too close to the lot line, can still have a protected ADU. Towns can't block an ADU in an existing structure just because the structure or lot is nonconforming (760 CMR 71.03(3)(b)9).
- Modular is allowed. A town can't treat a modular or factory-built ADU more strictly than the building code does.
What can my Cape town still regulate, and what can't it?
| Your town can regulate | Your town cannot require |
|---|---|
| Title 5 (the state septic code) rules, no stricter than for a single-family house | Owner occupancy of the ADU or the main house |
| Setbacks, height, bulk, lot coverage (no stricter than for the main house or an accessory building) | A special permit, variance or other discretionary approval for one ADU |
| Clear, objective site plan review | That the tenant be family, a certain age or a certain income |
| Design standards it applies to single-family homes | More than 1 parking space (none within 0.5 mile of a qualifying transit station) |
| Short-term rentals (it can ban them) | A minimum lot size for the ADU |
| Stricter design rules inside a historic district | A cap on how many ADUs the town allows |
| A special permit in a floodplain or aquifer overlay, if the main house would need one | That the ADU be attached, or detached |
Source line under the table: 760 CMR 71.03 and M.G.L. c.40A §3, as of November 14, 2026.
More about what can my Cape town still regulate, and what can't it
- "Reasonable" has a legal test. Under 760 CMR 71.03(3), a town rule is unreasonable if it doesn't serve a real zoning purpose, or if it does but would kill the ADU, add excessive cost, or substantially interfere with it "without appreciably advancing" the town's interest.
- Dimensional rules. A town can't hold an ADU to tighter setbacks, lot coverage, open space, height or number of stories than it would apply to the main house, a single-family home or an accessory building in that district, whichever is more lenient.
- Utilities. A town can't require a separate water, sewer or electric connection unless a utility, state law, a board or commission, or a court requires it.
- Studies and fees. A town can't demand an impact study or impact fee for an ADU that it wouldn't demand for a single-family house.
- Floodplain and aquifer overlays. These matter on the Cape. A town may require a special permit for a protected ADU in a floodplain or aquifer protection overlay if the main house would need one. The criteria must be "clear, objective, and non-discretionary."
- Historic districts. Inside a historic district (for example, the Old King's Highway Historic District), towns may set stricter design and dimensional standards for ADUs, as long as they still pass the reasonableness test. Yarmouth's town page says its Old King's Highway district "includes all properties north of Route 6." If you're in a historic district, plan for a design review on top of the building permit.
- Old conditions on older ADUs. If your ADU was approved before January 31, 2025 with an owner-occupancy rule or another condition that's now prohibited, the town can't enforce that condition (760 CMR 71.03(4)).
- Address. Every ADU gets its own address under the MassGIS standard.
Will my septic system (Title 5) allow an ADU?
- If your home is on septic, septic capacity can decide your ADU before zoning does.
- Title 5, the state septic code, sizes septic systems by bedrooms, at 110 gallons per day per bedroom. That number is the "design flow": how much wastewater the system is built to handle. MassDEP says ADUs use the same number.
- If the ADU adds bedrooms to the property, MassDEP treats it as "new construction" for septic. The system serving those bedrooms has to meet full Title 5 standards.
- If you keep the property's total bedroom count the same (for example, turn a bedroom in the main house into a den), you may avoid an upgrade. You'll still need a two-compartment tank (or two tanks in series), and an inspection if the existing system doesn't conform.
- Start with your town's Board of Health or Health Division. Ask how many bedrooms your lot is approved for.
More about will my septic system (Title 5) allow an ADU
MassDEP's Guidance on Title 5 Compliance for Accessory Dwelling Units (dated April 7, 2025; mass.gov lists it with a companion FAQ, updated September 11, 2025) covers the common cases:
| Your situation | What MassDEP's guidance says happens |
|---|---|
| ADU ties into an existing, fully compliant system and adds bedrooms | The system must meet new-construction standards for the total bedrooms on the property. Two-compartment tank (or two tanks in series) required. |
| ADU ties into an existing, fully compliant system, no added bedrooms | Two-compartment tank (or two tanks in series) required. |
| ADU gets its own new system, main house system is compliant | The new system must meet new-construction standards for the ADU's bedrooms. |
| ADU ties into an existing nonconforming system (for example, a cesspool) and adds bedrooms | The existing system must meet new-construction standards for all bedrooms. Two-compartment tank required. |
| ADU ties into a nonconforming system, no added bedrooms | The system must be inspected and, if it fails, upgraded. Two-compartment tank required. |
| ADU gets its own system, main house system is nonconforming, bedrooms added | Both systems must meet new-construction standards for their own bedrooms. |
Source line under the table: MassDEP, Guidance on Title 5 Compliance for ADUs (April 7, 2025). "Nonconforming" means an older system, such as a cesspool, that doesn't meet today's Title 5.
More you should know:
- The tank rule has exceptions. MassDEP notes case-specific exceptions, such as an ADU with its own dedicated tank, and the Board of Health can consider a variance (MassDEP ADU guidance, footnote 2; ADU FAQ Q46).
- Separate systems still count as one. Even if the ADU gets its own system, MassDEP treats both systems on the lot as one system serving the property.
- There's no bedroom limit, small or large. State law caps an ADU by size only, and the state's ADU FAQ (Housing and Livable Communities) says towns can't limit bedrooms beyond the state code. Septic capacity is the real limit. One bedroom is fine too: Title 5 bars building a single-family home with only one bedroom, but MassDEP says that bar doesn't apply to an ADU, because the property as a whole has more than one bedroom.
- Nitrogen on the Cape. MassDEP's 2023 rules made most Cape watersheds "Nitrogen Sensitive Areas": places where nitrogen from septic systems is polluting coastal bays. New construction there must use "Best Available Nitrogen Reducing Technology" (BANRT), which usually means an I/A (innovative/alternative) septic system that removes more nitrogen. MassDEP suspends that state requirement only in watersheds covered by a town's watershed permit or a filing for one, and a town can still require it locally. Ask your Board of Health whether it applies in your watershed. If your ADU counts as new construction in one of those areas, expect a more expensive system. Our septic, Title 5 and adding space guide walks through it.
- Variances exist but are narrow. A local Board of Health can vary Title 5 only if strict enforcement would be "manifestly unjust" and the owner shows equal environmental protection.
- Towns can't be stricter than state septic rules for an ADU than they are for a single-family home (760 CMR 71.03(3)(b)4). Barnstable publishes a guide called Options for Resolving Your Bedroom Count Issue, a good example of the questions to ask your own town.
Not sure what your septic allows? We'll check with you whether it can handle the ADU, then work with you and your Board of Health to find out whether it can go ahead and what your options are. Sometimes, like keeping the bedroom count the same, that avoids a full new system.
Can I rent my ADU, and can I use it as a short-term rental?
- Long-term renting is protected. A town can't stop you renting the ADU to anyone, and it can't require that you live on the property.
- Short-term renting is the town's call. State law lets towns restrict or ban short-term rentals in ADUs, and every town on the Cape Cod Commission chart limits them in some way.
- Under the state rooms-excise law, a short-term rental stay is 31 consecutive days or less.
- On the Cape Cod Commission chart (June 12, 2026), town minimums run from 30 days (Mashpee) up to 12 months (Sandwich, Truro, Wellfleet, Yarmouth) or a year-round lease (Chatham). Falmouth bars using either unit as a "Commercial Accommodation" at any time. See the town table.
More about can I rent my ADU, and can I use it as a short-term rental
- The town's power comes from c.40A §3 ("may be subject to restrictions and prohibitions on short-term rental") and M.G.L. c.64G. Section 14 lets a town regulate operators, including "the number of days a person may operate and rent out an accommodation."
- Seasonal communities. Nine Cape towns are legislatively designated "seasonal communities" under the Affordable Homes Act: Brewster, Chatham, Dennis, Eastham, Harwich, Orleans, Provincetown, Truro and Wellfleet. A designation takes effect only when the town accepts it. Ask your town whether it has.
- Proposed change to watch (not adopted). HLC's 2026 draft amendments to 760 CMR 71.00 would let a seasonal community require a year-round occupancy restriction on a protected ADU, under zoning adopted through the seasonal-communities regulation (760 CMR 76.00). The same draft would also say that a town's short-term rental power doesn't cover rules requiring an ADU to be leased "for more than 32 consecutive days." These are drafts. See the next section.
- Tax and insurance. A short-term rental also has state registration and excise rules. Talk to your accountant and insurer before you list it.
What's changing in 2026? (Pending, not yet law)
- HLC (the state's Executive Office of Housing and Livable Communities) has proposed revisions to 760 CMR 71.00. Public comments closed October 9, 2026.
- As of November 14, 2026, mass.gov still says HLC "is proposing" them. They are not in effect. Today's rules are the January 31, 2025 regulation.
- If they're adopted as drafted, they'd mostly make ADUs easier, with one big exception for seasonal Cape towns (year-round restrictions).
More about what's changing in 2026
What the informational redline shows (draft language, could change):
- Floor area: for sizing the ADU itself, common areas, enclosed exterior stairs, breezeways and egress areas would be excluded.
- Minimum lot area: added to the list of flat-out prohibited rules.
- Year-round restrictions: allowed as a condition of town money or town land. Seasonal communities could also require them under seasonal-communities zoning.
- Septic and utilities: no town department, board or commission could be stricter than state law, including Title 5. "A separate or common" utility connection or septic system could not be required.
- Energy code: the specialized stretch code would count as the state minimum in towns that opted into it.
- Site plan review would have to be "written, clear, and objective."
- Fees: no fees beyond what a single-family house pays, including utility connection fees.
- Nonconforming properties: a Section 6 finding could be required only where the ADU creates or increases a nonconformity, and it would have to be decided as of right.
- Short-term rentals: towns' short-term rental power would not include rules requiring leases of "more than 32 consecutive days."
- No horse-trading: a town couldn't trade a special permit or other approval for an ADU restriction the law prohibits.
How much parking does a Cape Cod ADU need?
- State law caps it: a town can't require more than one extra space for a protected ADU.
- None can be required if any part of your lot is within 0.5 mile of a qualifying transit station (commuter rail, subway, ferry terminal or bus station).
- Ferry terminals and commuter rail stations only count if they have year-round, regularly scheduled service, not seasonal service.
More about how much parking does a Cape Cod ADU need
A "Bus Station" in 760 CMR 71.02 is "a location serving as a point of embarkation for any bus operated by a Transit Authority." Whether a given Cape stop qualifies is a question for your building department, so ask before you design the driveway. Some Cape bylaw summaries still list more than one space, or a minimum of one. For a protected ADU, the state cap controls. If your town asks for more, ask how it's applying 760 CMR 71.03(2)(b).
What other codes apply? (building, fire, energy)
- Zoning protection doesn't waive the building code, fire code or the Lead Law. 760 CMR 71.00 says so directly.
- Under the stretch energy code's HERS-rating path, ADUs have their own target, between new construction and additions. A HERS index is a home energy score; lower means more efficient.
- HLC reports that attached ADUs "must achieve fire separation and sometimes must meet sprinkler requirements," and that fire officials sometimes ask for fire lanes to detached ADUs.
More about what other codes apply
- Energy code (225 CMR 22.00, Table R406.5, maximum HERS index): ADUs 52 mixed-fuel, 55 all-electric, 55 with solar, 58 all-electric with solar. That compares with 42–45 for new homes and 65–75 for major alterations and additions. Which energy code your town uses changes the details: all 15 Cape towns are on the stretch code, and Eastham, Truro and Wellfleet have also adopted the specialized code (DOER adoption list, as of October 27, 2026). Confirm with your building department.
- What building officials are seeing. In HLC's 2025–2026 survey, officials reported that septic expansions ("especially where local requirements exceed state standards"), energy code compliance, fire separation and sprinklers in attached ADUs, fire-lane demands for detached ADUs, and utility requests for separate service connections all push costs up. Plan for each of these early.
Cape Cod ADU rules, town by town
All 15 Cape towns appear on the Cape Cod Commission's ADU chart (still the June 12, 2026 edition as of November 14, 2026). Two (Harwich and Yarmouth) haven't updated their zoning to match state law yet, and four (Bourne, Chatham, Eastham and Truro) passed updates that were still waiting on the Attorney General when the Commission last checked. Use this table to find your town's rule, then confirm with the town.
More about cape Cod ADU rules, town by town
| Town | Town's ADU rule (we opened this link) | Rental minimum (Cape Cod Commission chart, June 12, 2026) | Max size (same chart) | Status flag (same chart) | ADUs approved, Jan 2025 to Jun 2026 (HLC survey) |
|---|---|---|---|---|---|
| Barnstable (incl. Hyannis, Centerville, Osterville, Cotuit, Marstons Mills) | Zoning §240-47.2, ADUs (opens in a new tab) · Town ADU page (opens in a new tab) | More than 31 days | 900 sf or 50% GFA. A larger ADU needs a special permit, and only existing structures over 900 sf are considered (bylaw §240-47.2) | Updated | 17 |
| Bourne (incl. Pocasset, Cataumet, Buzzards Bay) | Town ADU Information page (opens in a new tab) | 90 days | 1,500 sf or 50% GFA, whichever is smaller (town page and the 2026 amendment text; the chart omits "50%") | Passed May 4, 2026 Town Meeting (Article 28), which also drops the old 5,000 sf minimum lot; pending AG approval per chart. Confirm it is in effect with the town | No response |
| Brewster | Zoning §179-42.2, Protected Use ADUs (opens in a new tab) | 10 months | 1,000 sf | Updated | 5 |
| Chatham | Town Meeting page (2026 ADU bylaw, Article 51) (opens in a new tab). The posted Protective Zoning Bylaw (opens in a new tab) is still the May 2025 edition | Year-round lease | 900 sf or 50% GFA | New ADU bylaw adopted at the May 11, 2026 Town Meeting (town's unofficial results); pending AG approval per chart. Confirm it is in effect with the town | 3 |
| Dennis | Zoning By-law (PDF, through ATM May 6, 2025), §4.11 (opens in a new tab) | More than 31 days | 900 sf or 50% GFA | Updated | 9 |
| Eastham | Zoning Bylaws (PDF, May 2026 ATM) (opens in a new tab) · Eastham ADU programs page (opens in a new tab) | Year-round (at least 10 consecutive months) | 900 sf or 50% GFA | Pending AG approval | 0 |
| Falmouth (incl. Woods Hole, North Falmouth, East Falmouth) | Zoning Chapter 240, §240-9.1 (opens in a new tab) | Neither unit may be a "Commercial Accommodation" at any time | 900 sf or 50% GFA | Updated | 22 |
| Harwich (incl. Harwich Port) | Zoning Chapter 325 (opens in a new tab) | Only the ADU or the main house may be rented at a time; 6-month minimum | 1,000 sf / 2 bedrooms | Not yet updated to state law (chart lists owner occupancy and minimum lot size, both prohibited for a protected ADU under 760 CMR 71.03) | 18 |
| Mashpee (incl. New Seabury) | Zoning Bylaws 2026 (PDF), §174-45.4 (opens in a new tab) | 30 days | 900 sf or 50% GFA | Updated | 7 |
| Orleans | Zoning §164-7.12, Accessory Dwellings (opens in a new tab) | 90 days | 1,200 sf | Updated | 11 |
| Provincetown | Zoning By-laws (PDF, updated Aug 29, 2025) (opens in a new tab) | More than 31 days | 900 sf or 50% GFA | Updated | 4 |
| Sandwich | Protective Zoning By-law (PDF, Nov 2025), §4130 (opens in a new tab) | 12 months | 900 sf or 50% GFA | Updated | 8 |
| Truro | Planning Board page (2024 Zoning Bylaw PDF) (opens in a new tab) | 12 months (ADU or main house) | 900 sf or 50% GFA | Pending AG approval (posted bylaw is the May 2024 edition) | 6 |
| Wellfleet | Zoning Chapter 235 (eCode360) (opens in a new tab) · Town bylaws page (opens in a new tab) | 12 months | 1,200 sf | Updated | No response |
| Yarmouth (incl. Yarmouth Port, South Yarmouth, West Yarmouth) | Zoning Bylaw page (opens in a new tab) (§407, "Accessory Apartments," amended through Apr 28, 2026) | 12 months | 800 sf/50% up to 1 BR; 900 sf/50% for 2 BR | Not yet updated to state law | 21 |
- "Rental minimum," "Max size" and "Status flag" come from the Cape Cod Commission's ADU provisions by town chart (updated June 12, 2026). The Commission says it's a high-level summary. Your town's bylaw controls.
- "Approved" counts are what each town's building official reported to HLC (2025 surveys plus the January–June 2026 survey). "No response" means the town didn't answer, not that it has no ADUs.
- Where a town hasn't updated (Harwich, Yarmouth): state law still says no bylaw may prohibit, or require a special permit for, one ADU in a single-family district. Yarmouth's §407 still lists minimum lot sizes of 10,000 sq ft (studio or one bedroom) and 15,000 sq ft (two bedrooms), and two off-street spaces for the apartment on top of two for the main house, while 760 CMR 71.03 bars a minimum lot size and caps parking at one space. Ask the building department how it's handling protected ADUs until the bylaw is updated.
- Bylaws change at Town Meeting. Confirm with the town before you design.
How do I get an ADU approved on Cape Cod? (step by step)
- Septic first. Ask the Board of Health for your approved bedroom count, and whether you're in a nitrogen-sensitive watershed or on sewer.
- Zoning check. Ask the building or planning department whether your lot is in a single-family district, a floodplain or aquifer overlay, or a historic district.
- Size it. Measure the main house's gross floor area. Your cap is half of that, or 900 sq ft, whichever is smaller (or your town's larger limit).
- Design and permits. Plans, septic design if needed, any historic or conservation reviews, then the building permit.
- Build, inspect, certificate of occupancy, address.
More about how do I get an ADU approved on Cape Cod
- Barnstable's ADU page links a step-by-step How to Create an ADU guide and an ADU FAQ. Other towns handle it through the building department.
- Bourne takes ADU building permits through its online permitting system, OpenGov, per its town ADU page.
- HLC says many building officials now offer an early "ADU application review" meeting. It's worth booking one.
- A Yarmouth Port ADU in progress: when Cape Cod Carpentry Guild posted this update, the exterior was nearly wrapped up (board-and-batten siding painted gray, white trim, a new roof and Harvey windows), interior framing was complete, and rough electrical and plumbing were underway. See the build (opens in a new tab).
- Not sure where your lot stands? Our ADU feasibility check (Check if an ADU fits your lot (free)) asks the same questions a building official will.
Can I get help paying for an ADU?
- MassHousing ADU Loan Program: loans up to $250,000 for a detached ADU or $150,000 for an attached one, for income-eligible owners who live in the home as their primary residence.
- MHP ADU Incentive Program: a directory of feasibility-study providers who've agreed to charge no more than $500 (as described on Barnstable's and Eastham's town pages).
More about can I get help paying for an ADU
- MassHousing's loans mix an amortizing loan with zero-interest, deferred financing. You must have plans and permits in hand before you apply, and projects started before closing aren't eligible. Cape lenders listed on MassHousing's page include Cape Cod Five (Barnstable County) and Bristol County Savings Bank (Bourne and Falmouth only), plus statewide lenders.
- Barnstable's ADU page says the loan program launched March 17, 2026.
- Note: zoning can't require owner occupancy, but this loan program does (an eligibility rule, not a zoning rule).
- What does an ADU cost? MassCEC, a state agency, puts a detached two-bedroom ADU at $250,000–$450,000 and an attached one at $235,000–$360,000, including site work and construction (goclean.masscec.com, 2026). More in our Cape Cod renovation cost guide. These are published figures, not our prices; every proposal is priced to the site.
Why work with a Cape Cod design-build team on an ADU?
An ADU is a small house with all the rules of a big one: septic, setbacks, fire separation, energy code, and sometimes historic review. Guild Design Build handles design and construction with one team, so the septic answer, the zoning answer and the floor plan get solved together. We handle design in-house, including architectural and structural design, and our team includes structural engineers, a professional land surveyor and septic design. You don't need to hire your own designer, engineer, surveyor or septic designer.
More about why work with a Cape Cod design-build team on an ADU
Guild Design Build is the design-build side of Cape Cod Carpentry Guild Inc., which has an ADU project in Yarmouth Port and its own ADU service page. Rick Conway, who runs it, has 29 years in the trades. Start with the feasibility check, or request a proposal.
MA Home Improvement Contractor #210736 · based in Pocasset · see our Yarmouth Port ADU build (opens in a new tab).
Frequently asked questions
Do I need a special permit to build an ADU on Cape Cod?
Not for one ADU in a single-family zoning district. State law makes it by right; you need a building permit, septic approval, and any review that applies to a single-family house.
More about this answer: Do I need a special permit to build an ADU on Cape Cod?
You may still need a special permit in a few cases: a second ADU on the same lot, a protected ADU in a floodplain or aquifer protection overlay where the main house would need one, or an ADU larger than the town's by-right size. Historic district review (such as Old King's Highway) is separate from zoning.
Do I have to live on the property to have an ADU?
No. Towns can't require owner occupancy of the ADU or the main house.
More about this answer: Do I have to live on the property to have an ADU?
Some financing does. The MassHousing ADU loan requires that you occupy the single-family home as your primary residence.
How big can an ADU be on Cape Cod?
Up to half the main house's gross floor area or 900 sq ft, whichever is smaller, unless your town allows more.
More about this answer: How big can an ADU be on Cape Cod?
Per the Cape Cod Commission's June 2026 chart, Brewster allows 1,000 sq ft, Orleans and Wellfleet 1,200 sq ft, and Bourne's town page says 1,500 sq ft or 50%. Basements and lofts with code-height ceilings count toward the main house's floor area. Attics, crawl spaces, garage parking areas and enclosed porches don't.
Can I Airbnb my ADU on Cape Cod?
Usually not. Towns may ban short-term rentals in ADUs, and every Cape town on the Cape Cod Commission's chart limits ADU rentals, from a 30-day minimum up to 12 months or year-round.
More about this answer: Can I Airbnb my ADU on Cape Cod?
Check the town table above. In the nine legislatively designated seasonal communities, a 2026 draft state rule (not adopted) would let towns that accept the designation require year-round occupancy.
Will an ADU require a new septic system?
If it adds bedrooms to the property, the system serving those bedrooms has to meet full Title 5 new-construction standards. That often means an upgrade.
More about this answer: Will an ADU require a new septic system?
If you keep the total bedroom count the same, you may avoid an upgrade, but MassDEP's guidance still calls for a two-compartment tank (or two tanks in series). In Cape nitrogen-sensitive watersheds, new construction may need nitrogen-reducing treatment. Your Board of Health makes the call. We check with you whether your septic can handle the ADU, and work with you and the Board of Health on the options.
How many bedrooms can an ADU have?
There's no set bedroom limit. State law caps an ADU by size only, and the state's ADU FAQ says towns can't limit bedrooms beyond the state code. In practice, your septic capacity, and your Board of Health's rules for it, decide it.
More about this answer: How many bedrooms can an ADU have?
The size cap is half your home's floor area or 900 sq ft, whichever is smaller, so the floor plan sets a practical ceiling. Title 5 sizes septic at 110 gallons per day per bedroom, and bedrooms the ADU adds count toward what your system has to handle. A one-bedroom ADU is fine too: MassDEP says Title 5's bar on one-bedroom homes doesn't apply to an ADU. We check with you how many bedrooms your septic can take.
How many parking spaces does an ADU need?
No more than one, and none if your lot is within half a mile of a qualifying transit station.
More about this answer: How many parking spaces does an ADU need?
Ferry terminals and commuter rail count only with year-round, regular service. Ask your building department whether a nearby bus stop qualifies.
Can I turn my garage or basement into an ADU?
Yes. ADUs can be inside the house, attached, or in a detached building such as a garage, and towns can't require one type over another.
More about this answer: Can I turn my garage or basement into an ADU?
Converting existing space still has to meet the building code (egress, ceiling height, fire separation) and the energy code. HLC reports that energy code compliance is a major cost driver for ADUs inside existing homes.
Are the 2026 ADU rule changes in effect?
No. As of November 14, 2026 they're proposed revisions. The comment period closed October 9, 2026.
More about this answer: Are the 2026 ADU rule changes in effect?
We'll update this page when HLC adopts final rules. The current rule is 760 CMR 71.00 as published January 31, 2025.